Industrial Automation
- Machine, PLC and robotics integration
- Automation of shop-floor equipment
ProMonitor connects CNCs, PLCs, robots and industrial systems to give manufacturers real-time visibility, production intelligence and predictive insight.
From the machine to the decision, and where ProMonitor fits.
Live machine states, telemetry and alarms across plants, lines and machines, so operators and management see the same picture as it changes.
Real-Time Monitoringassets/promonitor/monitoring-machine.webp
Health scores, failure probability and remaining useful life for every asset, with a risk matrix that shows which machines need attention first.
Predictive Maintenanceassets/promonitor/pdm-overview.webp
A scheduler that re-plans when a machine breaks down or an order changes, and lets a planner approve the recommended schedule. Currently a proof of concept.
Job Shop Schedulingassets/promonitor/scheduler-board.webp
ProMonitor also includes Production Monitoring for plan versus actual output.
Industry 4.0 solutions across manufacturing and process-driven sectors.
Implemented by VAMS Mechatronica in the railway sector.
Implemented by VAMS Mechatronica in the defence sector.
Predictive maintenance, CNC monitoring, robotics and assembly automation.
Energy monitoring, process optimization, packaging line analytics.
IoT-based loom monitoring, spindle analytics, quality improvement.
Machine vision inspection, OCR, compliance and traceability.
Continuous process monitoring, asset reliability and safety.
Real-time dashboards, OEE improvement, smart factory solutions.
How shop-floor equipment links to business decisions. Select a layer to see what it does.
CNC machines, PLCs, robots and sensors on the shop floor generate the raw signals: speed, temperature, vibration, energy, status.
Talk to our team about machine connectivity, Industry 4.0 implementation and ProMonitor.